Like Chicago or San Francisco, Dallas was remade by disaster. The Great Flood of May 26, 1908 was the town's largest natural catastrophe. It was not nearly as deadly as San Francisco's earthquake or as destructive as Chicago's fire and is far less known than either, but it had much the same effect on the city's history. The flood served to end arguments that had been stirring for a decade over how to turn a sprawling boomtown into a modern metropolis. The result was the so-called Kessler Plan.
"It was the beginning of when people started looking at the city as a real object rather than a collection of individuals trying to make a living," Dr. Robert Fairbanks, professor of history at the University of Texas at Arlington, said of the Kessler Plan. "For the first time, Dallas became more than about just attracting jobs or attracting industry. People thought about the city as a whole."
The ideas of George Kessler form a major part of Dallas to this day. The Trinity River levee system built decades later opened up sections of the upriver floodplain for commercial use, resulting in the Stemmons Corridor, one of the region's principal economic engines. His proposal for a "great thoroughfare" became what is now Central Expressway, which in turn spurred growth in towns almost as close to the Red River as to the Trinity.
Other ideas, though less sweeping, are part of the city's identity, Union Station, Ferris Plaza, White Rock Lake Park, Turtle Creek Boulevard and, if we all live long enough, the Trinity River Corridor Project. In 1908, however, the flood's most immediate effect was to dampen local celebrations of the first nationwide commemoration of Mother's Day.
That Sunday morning, May 24, dawned rainy. Over the course of the day, 15 inches fell on the city, according to After the Deluge, the Impact of the Trinity River Flood of 1908, by Dallas writer Jackie McElhaney. Such a torrent would have overwhelmed the Trinity's channel in any case, but the downpour came at the worst possible time. For three previous days, counties upriver had sustained cloudbursts, and the watershed around Dallas was still sodden from a major flood a month earlier.
On May 26, the river crested at 52.6 feet, a record that still stands. Only a handful of people were killed (accounts vary, but historian Darwin Payne, author of Big D, settles on five). Four thousand people were left homeless, and property damage was estimated at $2.5 million, about $55 million today. But its most lasting effect was to demonstrate how poorly the city had been built.
The waterworks and electric plants were in areas that proved to be vulnerable to flooding, leaving the city without basic utilities. Telephone and telegraph lines went down. Rail lines were washed out. Every bridge near downtown was swept away, isolating the business district from the newly annexed neighborhood of Oak Cliff.
"Dallas wasn't prepared because no one in Dallas thought to be prepared," Ms. McElhaney said. "The growth of the city had been very haphazard. It just grew wherever it grew."
One aspect of the flood's timing was fortunate, it occurred during the Progressive Era, when local leaders across the country were rethinking how their cities were governed and structured. A beautification movement was trying to soften the raw industrial look of the 19th century. In Dallas, a group of city leaders led by Dallas Morning News publisher George Bannerman Dealey had four years before hired Mr. Kessler, one of the nation's leading planners, to design Fair Park. In 1910, on the second anniversary of the flood, he was hired again, this time to bring order to the entire city.
The German-born Kessler had lived in Dallas as a boy, but studied landscape design in Europe. In 1904, the same year he designed Fair Park, he was appointed landscape architect for the St. Louis World's Fair, according to Dr. Fairbanks' book For the City as a Whole: Planning, Politics and the Public Interest in Dallas, Texas. City leaders were punching above their weight. Most municipal planning was in much larger metropolitan areas such as New York, Dr. Fairbanks said. Dallas in 1910 had a population of 92,000.
"Dallas desperately wanted to be seen as a progressive city. Planning was very much the in thing of that day, and planning was almost a booster thing," she said. "Dallas got a lot of favorable publicity nationally out of the Kessler Plan."
Published in 1912 and refined over the years, the Kessler Plan called for rechanneling the Trinity a mile from downtown and building a levee system to contain future floods. But it went much further than solving flood problems. It sought to consolidate a rail system that was choking downtown and advocated straightening and standardizing the city's often chaotic streets. The plan also recommended a system of parks, boulevards and playgrounds.
To Mr. Kessler's frustration, much of his plan was incompletely executed or never implemented at all. His plan to turn Dallas into an inland port came to nothing, although it was still actively discussed as late as the 1970s. His vision of a "great thoroughfare" linking what was then known as the Highland Park Addition to the city's southern precincts was only partly realized.
The northern part was built and eventually became Central Expressway. But a land dispute with the railroad companies blocked construction to the south. Decades later, the street that he intended to knit the city together carried commuters ever farther from the city's southern neighborhoods. Not all results were so divisive. Even before floodwaters receded, and independent of the Kessler Plan, business leaders proposed a flood-proof "Great Causeway" linking downtown and Oak Cliff.
The bridge was built in only 17 months, in part because the Great Flood of 1908 preceded a long dry spell. Not a single day of construction was lost because of rain, according to Ms. McElhaney's article in Legacies magazine. At 5,480 feet, what is now known as the Houston Street Viaduct was the longest concrete structure in the world. The bridge guaranteed that flooding would never again disrupt commerce between the two sides of the river. It also had the effect of binding the older neighborhoods of Dallas with the formerly independent city of Oak Cliff, which had been annexed less than five years before the flood.
The Historians Abode provides a haven for the history and geology lover in all of us. Topics and historical data on a wide array of events throughout time such as great battles and historical events. Geological studies and articles are available as well such as the Geology of Texas series. A great resource for history buffs, research paper writers and history teachers.
Friday, October 31, 2008
Tuesday, October 7, 2008
Mars Mission in Trouble?
Will NASA's flagship mission to Mars fly next year? The space agency could decide as early as Friday whether to cancel, delay or proceed with plans to launch a nuclear-powered, SUV-size rover to the red planet. NASA has already sunk $1.5 billion into the Mars Science Laboratory, which is pricier than expected. The megarover will roam the surface and drill into rocks for clues to whether the planet ever possessed an environment capable of supporting primitive life.
Doug McCuistion, who heads the Mars exploration program at NASA headquarters, told scientists in recent public meetings that he expects the mission's total cost to run over by more than 30 percent. If it goes over that threshold, Congress would have the right to intervene and use its power to end the project on its own.
Managed by NASA's Jet Propulsion Laboratory in California, the project has been plagued by development problems and ballooning costs that caught headquarters' attention. McCuistion told a gathering of Mars scientists last month that NASA was keeping a close eye on the project's progress and costs and participating in weekly reviews with JPL.
From the outset, the Mars Science Lab proved to be an engineering challenge due to its size and capability. The 9-foot-long robot geologist is bigger and can drive farther than its twin predecessors, Spirit and Opportunity, which are still alive after four years. It also carries some of the most sophisticated instruments, including a laser that can zap rocks from afar. The mission's financial woes took many in the science community by surprise who fear that other projects will suffer to pay for the mega-rover.
"The magnitude of the increases has been mind-boggling," said geologist John Mustard of Brown University. "It has sent a shock wave to the Mars program and beyond to the planetary community."
If NASA pushes to launch in 2009 as planned, it will have to find the money to get the rover ready. Any delay until 2010 or 2011 will add at least $300 million to the mission's price tag. Alex Dery Snider, a spokeswoman for the House Science Committee, said members were concerned about the extra cost and want to know how NASA will solve the problem. Some scientists outside the Mars research community said canceling the project does not make sense since so much money has already been invested.
"We've got to continue our exploration of Mars, but in a way that's rational and sensible," said Frances Bagenal of the University of Colorado, Boulder.
Doug McCuistion, who heads the Mars exploration program at NASA headquarters, told scientists in recent public meetings that he expects the mission's total cost to run over by more than 30 percent. If it goes over that threshold, Congress would have the right to intervene and use its power to end the project on its own.
Managed by NASA's Jet Propulsion Laboratory in California, the project has been plagued by development problems and ballooning costs that caught headquarters' attention. McCuistion told a gathering of Mars scientists last month that NASA was keeping a close eye on the project's progress and costs and participating in weekly reviews with JPL.
From the outset, the Mars Science Lab proved to be an engineering challenge due to its size and capability. The 9-foot-long robot geologist is bigger and can drive farther than its twin predecessors, Spirit and Opportunity, which are still alive after four years. It also carries some of the most sophisticated instruments, including a laser that can zap rocks from afar. The mission's financial woes took many in the science community by surprise who fear that other projects will suffer to pay for the mega-rover.
"The magnitude of the increases has been mind-boggling," said geologist John Mustard of Brown University. "It has sent a shock wave to the Mars program and beyond to the planetary community."
If NASA pushes to launch in 2009 as planned, it will have to find the money to get the rover ready. Any delay until 2010 or 2011 will add at least $300 million to the mission's price tag. Alex Dery Snider, a spokeswoman for the House Science Committee, said members were concerned about the extra cost and want to know how NASA will solve the problem. Some scientists outside the Mars research community said canceling the project does not make sense since so much money has already been invested.
"We've got to continue our exploration of Mars, but in a way that's rational and sensible," said Frances Bagenal of the University of Colorado, Boulder.
Subscribe to:
Posts (Atom)